Case Studies

We are a young and creative company and we offer you fresh business ideas for your team and company.
bt_bb_section_bottom_section_coverage_image
1
2 (1)
PROJECT DESCRIPTION
  • This project has comprised of two components i) Construction of a new Port ii) Construction of a new Port Access Road. The Construction of new road component has located in Chakaria and Moheskhali Upazilas of Cox’s Bazar district in Bangladesh.
  • Construction of 25.8 km long 4-lane Port Access Road on new Embankment
  • Construction of 17 bridges
  • Construction of 1.6 km long 4-lane Matarbari Port North-South Connector Road
  • Soft Soil Improvement Works
KEY SERVICES
  • Study of the engineering survey and soil investigation results for the execution of design
  • Detail design of pavement sections
  • Fixation of road alignment
  • Assist in preparation of bid documents, bid evaluation and facilitation of pre-contract discussion and finalization of contract documents
  • Construction supervision
PROJECT VALUE
US$ 5,721,350.96
SECTOR
Infrastructure
CLIENT
Roads & Highways Department (RHD)
ugiip_1
ugiip_2
ugiip_3
PROJECT DESCRIPTION
  • Urban Infrastructure Improvement and construction (water supply and sanitation, urban roads and drainage, traffic management and intersection development, bus terminal, market development, slum improvement etc
  • Urban Governance Improvement
  • Capacity building
KEY SERVICES
  • Assistance to LGED in Pre-construction services (surveys and investigations, detailed design of infrastructure, bid Preparation and evaluation including award of contracts
  • Supervision construction of all civil works contract and services
  • Preparation of base maps, land use maps on scale 1:8000 for improvement/Expansion of Municipal Infrastructure facilities as Roads and Bridges; preparation of base map, spot lelvel map, landuse and drainage maps storm water drainage; system by using GIS software
  • Urban Governance Improvement Program in the areas of – citizen awareness and participation; women’s participation; integration of urban poor; financial accountability and sustainability and administrative transparency
  • Capacity building – Project management, engineering design, construction supervision, Institutional capacity building programs for Pourashava; training programs to implement the community based activities; computerization of tax records and billing; computerization of accounting management; infrastructure inventory assessment and mapping and training for decentralized township planning
PROJECT VALUE
US$ 5.34 million
SECTOR
Infrastructure
CLIENT
Local Government Engineering Department
dncc-1
dncc-2
dncc-3
PROJECT DESCRIPTION
  • Improvement of Different Damaged Road Infrastructure including Drains and Footpath Construction under Dhaka North City Corporation
  • To implement the abovementioned project smoothly and effectively, DNCC now engages a consulting firm for the Design Review, full time supervision during construction period and As-Built Drawing preparation purpose of the ongoing civil works under the project. The infrastructure improvement work includes the following components:
    – Road construction- 204 km (approx.)
    – Drainage (open/pipe)- 267 km
    – Footpath Facility- 119.27 km
KEY SERVICES
  • Full-time supervision and monitoring of construction works for ensuring quality and progress
  • Proper documentation of field work such as site order book, keeping records
  • Preparation of monthly and quarterly progress reports
  • Review of design and drawings of works
  • Preparation of As-built drawings and Project Completion Report (PCR) along with all documents
PROJECT VALUE
US$ 450,219
SECTOR
Infrastructure
CLIENT
Dhaka North City Corporation (DNCC)
NULL