ConsultingJanuary 9, 2018by devconContract signed with CAAB for feasibility study on the proposed Bangabandhu Sheikh Mujib International Airport

https://www.devconbd.com/wp-content/uploads/2018/01/caab_contract_sign_bsmia.jpg

OCTOBER 2016

The Association of Nippon Koei with DevCon and ACE has signed the contract with Civil Aviation Authority of Bangladesh (CAAB) to conduct a feasibility study on the proposed Bangabandhu Sheikh Mujib International Airport. The Contract period will be 18 months from starting from October 2016.