Detailed Survey, Investigation, Design and Construction Supervision for the Kanchpur, Meghna and Gumti Bridges Construction and Existing Rehabilitation (KMG) Project, Contract No PS- 01 (JICA Loan Agreement No BD-P72 dated 18 Nov 2013)

Project Information

Client: Roads and Highways Department (RHD), Ministry of Communications (MOC), the Government of the Bangladesh (GOB)

Sector: Transport

Location: Districts of Narayanganj and Comilla, Bangladesh

Funding Agency: JICA

Incorporation: Oriental Consultants Co, Japan, JBSI, KEI, NE, SMEC, BCL and ACE

Detailed Survey, Investigation, Design and Construction Supervision for the Kanchpur, Meghna and Gumti Bridges Construction and Existing Rehabilitation (KMG)  Project (Feb 2014 – Oct 2019)

Description of the Project:

The scope of consultancy services for the project encompasses the major works of Review of Feasibility Studies, Detailed Survey, Investigation, Design and Construction Supervision of the Kanchpur, Meghna and Gumti 2nd Bridges and Construction and Rehabilitation of the existing bridges; preparation of cost estimates, financial analysis, bidding documents, bid evaluation and assist contract negotiation. Also preparation of Operation and Maintenance Manual, Training Plans, Resettlement Action Plans (RAP), Environmental Management Plans (EMP), Environmental Monitoring Plans (EMP) and others. Design of weigh stations and the operation guides, Preparation of Traffic Management Plans, Toll Collection Plans, Be responsible for the Defect Liability Period and periodical Reporting. The structural specifications of the three bridges are as hereunder-

Kanchpur 2nd Bridge

Length: 396.5 m; (41.6m+85.4m+97.6m+73.2m+54.9m+41.6m);

Width: 18.4m (4 Lanes); [14.6m (road) + 1.1m (sidewalk) +2.7m(sidewalk)]

Superstructure Type; Continuous steel narrow box girder

Substructure Type; Abutment: Inverted T-type, 2 nos.; Pier: Columnar type, 5 nos.; Foundation: RC bored pile, 3 nos.; Steel Pipe Sheet Pile (SPSP) 4 nos.

Meghna 2nd Bridge

Length: 930.0m; (47.4m+9@87.0m+73.5m+23.9m)

Width: 17.75m [4 Lanes); (15.55m (road) + 2×1.1m (sidewalk)]

Superstructure Type; Continuous steel narrow box girder

Substructure Type; Abutment: Inverted T-type, 2 nos.; Pier: Columnar type, 11 Nos.; Foundation: RC bored pile, 5 nos; Steel Pipe Sheet Pile (SPSP) 8 nos.

Gumti 2nd Bridge

Length: 1410.0m; (51.4m+7@87.0m+86.15m,86.15m+6@87.0m+51.4m)

Width: 17.75m (4 Lanes); [15.55m (road) + 2×1.1m (sidewalk)]

Superstructure Type; Continuous steel narrow box girder

Substructure Type; Abutment: Inverted T-type, 2 nos.; Pier: Columnar type, 16 nos. Foundation: RC bored pile, 10 nos; Steel Pipe Sheet Pile (SPSP) 8 nos.

Description of Actual Services :

As a local Associate provided all assistance to the Principal Consultants in the matter of the following, leading to the successful completion of the Project:

  • Review of feasibility studies, Detailed Survey, Investigation, Design and Construction Supervision of the 3 bridges,
  • Preparation of cost estimates, financial analysis, bidding documents, Operation and Maintenance Manual, Training Plans,
  • Design of weigh stations and preparation of the operation guides, preparation of Traffic Management Plans,
  • Help bid evaluation, contract negotiation and periodical reporting.

 

 